Glover 2023 Project Details
Filled lots of splits that were appearing on a dry cabin. From there, the sunny sides got 2 coats while the shaded only got 1 coat.
Scope of Work:
Carpentry:
- Sealed septic exhaust pipe on roof
- Sealed flashing around chimney
Prep:
- Pressure wash with Simple Green
- Filled cracks in logs on all sides of the cabin
- Caulk, wedge waterproof foam, caulk again
- Scraping & sanding on any lose/flaking stain
Painting:
- Applied 2 coats on all trim and siding on left and back sides
- Applied 1 coat on all trim and siding on front and right sides